Thermofusion HDPE Equal Mild ASME B16.9 Wpb Reducing Seamless Forged Carbon Steel Butt-Welding Pipe Fitting Straight Reducer Tee
Basic Info
Model NO. | 1/8"-4" |
Connection | Welding |
Material | Carbon Steel |
Shape | Equal Tee |
Lateral | 45°Tee |
Head Code | Round |
Wall Thickness | SCH10 |
Finish | Varnish Paint |
Technics | Forged |
Pressure Rating | 3000LBS |
Standard | ASTM |
Certification | ISO |
Size | 1/2"-80" |
Transport Package | Pallet, Wooden Case, |
Specification | API, ISO |
Trademark | ST |
Origin | Cangzhou, China |
HS Code | 730793 |
Production Capacity | 50, 000 Ton/Year. |
Product Description
ASME B16.9 Wpb Reducing Seamless Carbon Steel Pipe Fitting Tee Product DescriptionProduct Name | ASTM A234 Carbon Steel Equal DN200 Pipe Fittings Tee |
Size | 1/2"-72" |
Wall Thickness | SCH10,SCH20,SCH30,STD,SCH40,SCH60,XS,SCH80,SCH100,SCH120,SCH140,SCH160,XXS, DIN, JIS standard thickness |
Standard | ASTMA234,ASTM A420,ANSI B16.9/B16.28/B16.25,ASME B16.9,JIS B2311-1997/2312, JIS B2311/B2312, DIN 2605-1/2617/2615,GB 12459-99,EN Standard etc. |
Material | Q235, 20#, 10#, Q345A234 WPB, WP5, WP9,WP11,ST37.0,ST35.8,ST37.2,ST35.4/8,ST42,ST45,ST52,ST52.4STP G38,STP G42,STPT42,STB42,STS42,STPT49,STS49 |
Surface | Black painting,varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE,etc. |
Delivery Time | According to the quantity |
Transport Package | Plastic film,wooden cases ,wooden pallet,or as per customers' requests |
Shipment | Bulk Vessel or Container |
Trade Terms | CIF,FOB,EXW,CFR |
Payment Terms | TT/LC at sight |
Application | Low and middle pressure fluid pipeline,boiler, petroleum and natural gas industry,drilling,chemical industry, electric industry,shipbuilding,fertilizer equipment and pipeline, structure,petrochemical,pharmaceutical industry,etc. |
1. Reasonable price with excellent quality
2. Abundant stock and prompt delivery
3. Rich supply and export experience, sincere service
4. Reliable forwarder, 2-hour away from port.
Q: Are you trading company or manufacturer ?
A: We are directly pipe fitting factory founded in 2001, which has much longer history than other fellow suppliers. Our factory certified by ISO, ENAPI, capable of producing various kind of steel pipe fittings.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment
Q: I haven't done business with you guys before,how can I trust your company?
A: Our company established in 2006, we do pipe&fitting exporting work more than 15 years, which is longer than most of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates, for example, CE, ISO9001, API, Alibaba onsite check certificate.
Q: What is the minimum order?
A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or
you just need one piece, we would be very likely to make the MOQ as 1 piece for you.